Risk Register Template
This risk register template provides a structured format for recording, tracking, and managing all identified workplace risks in a centralised document. It captures hazard identification, risk assessment ratings, control measures, ownership, review dates, and status for each risk. Designed for Australian workplaces and compatible with ISO 45001:2018 and ISO 31000.
What Is It?
A risk register is a centralised document that records all identified risks, their assessed risk levels, the control measures in place, and the status of risk management activities. It serves as the master record of an organisation's risk landscape and provides the basis for prioritising risk management efforts, allocating resources, and reporting on risk management performance.
This template provides a structured risk register format that captures each risk with its description, the hazard source, the potential consequences, the likelihood and consequence ratings, the inherent risk level, the control measures implemented, the residual risk level, the risk owner, the review date, and the current status. The register can be sorted and filtered by risk level, category, owner, or status to support management decision-making.
The template includes a risk assessment matrix for consistent risk rating, a risk category taxonomy aligned with WHS hazard categories, and a status tracking system that flags overdue reviews and incomplete control measure implementation. It provides both a summary view for management reporting and detailed entries for each risk.
When Is It Required?
A risk register is expected as part of any competent WHS management system. It provides the central record of the organisation's risk management activities and demonstrates that hazards have been systematically identified, assessed, and controlled. Regulators, auditors, and clients routinely request risk register documentation.
ISO 45001:2018 requires organisations to maintain documented information about their hazard identification, risk assessment, and determination of controls. A risk register is the most practical way to satisfy this requirement and to demonstrate the systematic management of workplace risks.
The risk register should be updated whenever new hazards are identified, risk assessments are completed or reviewed, control measures are implemented or modified, incidents occur that affect the risk profile, or organisational changes introduce new risks.
What's Included
How This Is Different
This risk register template is designed by safety professionals who manage risk registers for Australian organisations. The template provides a practical format that supports active risk management, not just risk recording. The status tracking, review date flagging, and risk owner assignment ensure that the register drives action rather than becoming a static list of hazards. The template includes both the detailed register entries and a summary dashboard view suitable for management reporting. This dual-view approach means a single document serves both the operational risk management function and the management reporting function.
Frequently Asked Questions
What is the difference between a risk register and a risk assessment?
A risk assessment is the process of identifying hazards and evaluating the level of risk for a specific activity, area, or hazard category. A risk register is the centralised record that captures the results of all risk assessments, tracks the control measures, and monitors the status of risk management activities across the organisation. Risk assessments feed into the risk register.
How often should the risk register be reviewed?
Individual risk entries should be reviewed according to their assigned review frequency, which typically ranges from monthly for high risks to annually for low risks. The overall risk register should be reviewed at least quarterly to identify overdue reviews, assess the overall risk profile, and ensure the register is current. A full review should be conducted annually.
Is this template compatible with ISO 31000?
Yes. The risk register template follows the risk management process described in ISO 31000:2018 including risk identification, analysis, evaluation, and treatment. The terminology and methodology are consistent with the international standard for risk management.